Order of Operations

Use the Order of Operations dialog box to change the order of operations within a nested cluster. You can also assign a Machining Index to each operation, which is applied after sorting the operations.

After Mastercam has sorted the operations, it will move any operations assigned a non-zero machining index. The lower the machining index, the earlier the operation is machined. The higher the machining index, the later the operation is machined. For example, operations that are assigned a negative machining index (such as -5 and -1) are machined before operations not assigned to an index (0) and operations assigned to a positive machining index (such as 10 and 25) are machined after operations not assigned to an index. In that case, the machining order for six operations would be the following: -5, -1, 0, 10, 25.